Quiz 2025 First-grade PRINCE2 PRINCE2-Agile-Practitioner: PRINCE2 Agile Practitioner Project Management Exam Actual Exams
Quiz 2025 First-grade PRINCE2 PRINCE2-Agile-Practitioner: PRINCE2 Agile Practitioner Project Management Exam Actual Exams
Blog Article
Tags: PRINCE2-Agile-Practitioner Actual Exams, New PRINCE2-Agile-Practitioner Dumps Questions, PRINCE2-Agile-Practitioner Learning Materials, Exam PRINCE2-Agile-Practitioner Study Guide, Exam PRINCE2-Agile-Practitioner Review
Our PRINCE2-Agile-Practitioner training materials are compiled carefully with correct understanding of academic knowledge using the fewest words to express the most clear ideas, rather than unnecessary words expressions or sentences and try to avoid out-of-date words. And our PRINCE2-Agile-Practitioner Exam Questions are always the latest questions and answers for our customers since we keep updating them all the time to make sure our PRINCE2-Agile-Practitioner study guide is valid and the latest.
Are you looking for valid IT exam materials or study guide? You can try our free PRINCE2 PRINCE2-Agile-Practitioner new exam collection materials. We offer free demo download for our PDF version. You can know several questions of the real test. It can make you master fundamental knowledge quickly. Our PRINCE2-Agile-Practitioner new exam collection materials are authorized legal products. Our accuracy is nearly 100% pass which will help you clear exam.
>> PRINCE2-Agile-Practitioner Actual Exams <<
New PRINCE2-Agile-Practitioner Dumps Questions, PRINCE2-Agile-Practitioner Learning Materials
To help you prepare well, we offer three formats of our PRINCE2-Agile-Practitioner exam product. These formats include PRINCE2 PRINCE2-Agile-Practitioner PDF dumps, Desktop Practice Tests, and web-based PRINCE2 Agile Practitioner Project Management Exam (PRINCE2-Agile-Practitioner) practice test software. Our efficient customer service is available 24/7 to support you in case of trouble while using our PRINCE2-Agile-Practitioner Exam Dumps. Check out the features of our formats.
PRINCE2 PRINCE2-Agile-Practitioner Exam Syllabus Topics:
Topic | Details |
---|---|
Topic 1 |
|
Topic 2 |
|
Topic 3 |
|
Topic 4 |
|
Topic 5 |
|
PRINCE2 Agile Practitioner Project Management Exam Sample Questions (Q31-Q36):
NEW QUESTION # 31
Project scenario - Get fit with football!
(Note: The companies and people within the scenario are fictional)
Introduction
A Local Government Authority (LGA) has decided to organize a six-a-side football tournament. The tournament will contribute towards achieving the targets set by a national initiative to improve the fitness of children under the age of 16. As part of the LGA's policy of self-funding, this has to be achieved at zero cost to the LGA (and therefore the local tax payer). The cost of the event will be covered through fees paid by teams registered to take part in the tournament, sponsorship and monies raised during the day. Any surplus would be used for the maintenance of local sports centres.
Teams can register under one of several age groups for both boys and girls. In addition, family members are asked to attend to provide support.
This sports event is designed to be a family day out. The football tournament will have an event village including a kidz'-zone, catering, car parking, mobile changing rooms and toilets. The tournament will take place on the LGA-owned football pitches near the centre of the town, although space is somewhat limited.
Scope
The initial scope of the project includes:
a marketing campaign to promote the event;
a celebrity to open the event;
a website to provide information about the event and handle applications; an event village to support the 'family day out'; the training of LGA staff as volunteers to run and support the event; back-office processes to handle the applications; fundraising to cover the cost of the event.
The project has been set up with four work streams to deliver this work:
1. Marketing
2. Website
3. Event Village
4. Staff Training
Project Background
The LGA have extensive experience in using PRINCE2 and will run the event as a single project. The project manager is fully conversant with PRINCE2 Agile. One office in the LGA building in the centre of town has been given to the project for the entire duration. The office is across the corridor from the Marketing Department and the project manager has already put a sign on the door that says 'Mission Control'.
Timeline
An initial timeline has been suggested and is shown in the following diagram. The timeline may evolve due to the agile ways of working. The timeline shows how work streams are broken down into work packages and/or timeboxes.
Marketing - Additional information
The marketing campaign has two key areas to promote:
1. The event itself including the football tournament, event village and fundraising activities.
2. The LGA's long term aim to improve the fitness of children under the age of 16.
The Marketing Team has received some initial Scrum training but is unsure how it can be applied to their marketing work.
The Marketing Team is keen that the project manager provides them with a clear brief for the campaign before they spend too much time on it.
They have experience of working with a variety of marketing channels, although they are not sure which channel(s) will work most effectively to promote this type of event, and in particular to promote the LGA's longer term health aims.
The Marketing Team is not clear on the priority to assign to the two aims for the event.
The Marketing Team will publish advertisements and/or promotional material every week, with more information in each issue to keep the message up to date.
Nine releases are scheduled at the end of each of the nine week-long timeboxes.
The nine timeboxes within the marketing work stream are scheduled to include:
advertisements:
a radio interview;
production of a hand-out/flyer;
banners and signs to put up around the town and at the event;
the provision of a website and social media content;
promotional posters to be displayed by local businesses.
Using the Project Scenario and Marketing Additional information, answer the following question:
The Marketing Team is concerned that if local schools hold their annual fundraiser on the same day as the football tournament, this may cause attendance to be adversely affected.
The team manager has asked the business analyst to investigate this risk further and report back to the team at the next daily stand-up.
Which BEST explains how this approach manages risk?
- A. It is a poor approach because the team manager should carry out actions related to risks that may impact delivery.
- B. It is a good approach because discussions in the daily stand-up are a way to actively manage risk.
- C. It is a poor approach because this risk is outside the project's control so it is NOT relevant to the Marketing Team.
- D. It is a good approach because the business analyst is responsible for capturing the wider customer view.
Answer: B
Explanation:
The daily stand-up is an opportunity for the team to discuss ongoing issues, including risks. By having the business analyst investigate the potential conflict with the local schools' fundraiser and report back, the team can address this risk proactively and make informed decisions on how to mitigate it, thus managing risk effectively.
NEW QUESTION # 32
Project scenario - Get fit with football!
(Note: The companies and people within the scenario are fictional)
Introduction
A Local Government Authority (LGA) has decided to organize a six-a-side football tournament. The tournament will contribute towards achieving the targets set by a national initiative to improve the fitness of children under the age of 16. As part of the LGA's policy of self-funding, this has to be achieved at zero cost to the LGA (and therefore the local tax payer). The cost of the event will be covered through fees paid by teams registered to take part in the tournament, sponsorship and monies raised during the day. Any surplus would be used for the maintenance of local sports centres.
Teams can register under one of several age groups for both boys and girls. In addition, family members are asked to attend to provide support.
This sports event is designed to be a family day out. The football tournament will have an event village including a kidz'-zone, catering, car parking, mobile changing rooms and toilets. The tournament will take place on the LGA-owned football pitches near the centre of the town, although space is somewhat limited.
Scope
The initial scope of the project includes:
a marketing campaign to promote the event;
a celebrity to open the event;
a website to provide information about the event and handle applications; an event village to support the 'family day out'; the training of LGA staff as volunteers to run and support the event; back-office processes to handle the applications; fundraising to cover the cost of the event.
The project has been set up with four work streams to deliver this work:
1. Marketing
2. Website
3. Event Village
4. Staff Training
Project Background
The LGA have extensive experience in using PRINCE2 and will run the event as a single project. The project manager is fully conversant with PRINCE2 Agile. One office in the LGA building in the centre of town has been given to the project for the entire duration. The office is across the corridor from the Marketing Department and the project manager has already put a sign on the door that says 'Mission Control'.
Timeline
An initial timeline has been suggested and is shown in the following diagram. The timeline may evolve due to the agile ways of working. The timeline shows how work streams are broken down into work packages and/or timeboxes.
Event Village - Additional information
The aim of the event village is to provide a range of services and activities for anyone attending the football tournament.
The event village will comprise a number of work packages:
1. Event village design
2. A 'kids-zone' which includes trampolines and swings, as well as the opportunity to try out other sporting activities
3. Stalls which will be sold to local businesses to raise funds for the event:
Refreshment stalls within a large food tent. The LGA is keen to promote the culinary diversity of the town whilst adhering to the objective of eating healthily.
There are 30 vendor stalls selling products related to the event.
The LGA has five stalls to promote their longer term aims and to demonstrate current and future initiatives.
4. A car park for 200 cars.
5. Temporary facilities including changing rooms, toilets and shower facilities.
6. Dismantling of the event village and clean up.
The Event Village Team is assembled using staff from various LGA departments who have no experience of working with agile.
Using the Project Scenario and Event Village Additional information, answer the following question:
It has been agreed that supervised access to the vendor stalls will only be allowed between 16:00 and 20:00 on the day before the event to allow set-up.
Which is the BEST means of communicating these arrangements to all of the vendors?
- A. By telephone to discuss the arrangements with each stall holder.
- B. Using visualizations in the form of diagrams and pictures.
- C. Face to face in a workshop to enable discussion.
- D. By e-mailing everyone and asking for confirmation of receipt.
Answer: D
Explanation:
Emailing all vendors provides a clear, documented way to communicate the specific arrangements, and requesting confirmation of receipt ensures that each vendor acknowledges the information. This method is efficient for reaching multiple vendors simultaneously while allowing them to refer back to the details later.
NEW QUESTION # 33
Project scenario - Get fit with football!
(Note: The companies and people within the scenario are fictional)
Introduction
A Local Government Authority (LGA) has decided to organize a six-a-side football tournament. The tournament will contribute towards achieving the targets set by a national initiative to improve the fitness of children under the age of 16. As part of the LGA's policy of self-funding, this has to be achieved at zero cost to the LGA (and therefore the local tax payer). The cost of the event will be covered through fees paid by teams registered to take part in the tournament, sponsorship and monies raised during the day. Any surplus would be used for the maintenance of local sports centres.
Teams can register under one of several age groups for both boys and girls. In addition, family members are asked to attend to provide support.
This sports event is designed to be a family day out. The football tournament will have an event village including a kidz'-zone, catering, car parking, mobile changing rooms and toilets. The tournament will take place on the LGA-owned football pitches near the centre of the town, although space is somewhat limited.
Scope
The initial scope of the project includes:
a marketing campaign to promote the event;
a celebrity to open the event;
a website to provide information about the event and handle applications; an event village to support the 'family day out'; the training of LGA staff as volunteers to run and support the event; back-office processes to handle the applications; fundraising to cover the cost of the event.
The project has been set up with four work streams to deliver this work:
1. Marketing
2. Website
3. Event Village
4. Staff Training
Project Background
The LGA have extensive experience in using PRINCE2 and will run the event as a single project. The project manager is fully conversant with PRINCE2 Agile. One office in the LGA building in the centre oftown has been given to the project for the entire duration. The office is across the corridor from the Marketing Department and the project manager has already put a sign on the door that says 'Mission Control'.
Timeline
An initial timeline has been suggested and is shown in the following diagram. The timeline may evolve due to the agile ways of working. The timeline shows how work streams are broken down into work packages and/or timeboxes.
Website - Additional information
A new website will be built for the event. There are five work packages within this product:
1. Initial homepage:
Website showing the event details, competition rules, etc.
2. Team Registration functionality:
team name, player's names and ages;
contact information;
payment;
lunch pack requirements (includes any special dietary needs);
car parking requirements.
3. Social media promoting the event and its aims.
4. Applications (apps) to promote healthy lifestyles including fitness and healthy eating apps.
5. Health Park:
An online knowledge base about healthy lifestyles that includes a discussion forum.
The Website Team have a lot of experience in IT and have been using agile for several years. They are delivering the website through five two-week timeboxes. The team uses a Scrum Master to facilitate and the Scrum process and coach people accordingly.
The Website Team are very good at Scrum. They have created a set of tasks to assess more difficult work and they refer to this as sprint zero.
Using the Project Scenario and Website Additional information, answer the following question:
During the Apps and Social Media timebox in Stage 4, the LGA made a request for the customer subject matter expert to be allowed to return to operational work, in order to resolve an urgent problem. This request was successfully resisted by the executive.
At the subsequent retrospective, the following observation was made:
'The stability of the Website Team during the sprint contributed to delivery of all Must Haves and 3 out of the
4 Should Haves.'
How should this observation be captured?
- A. In the risk register reflecting the level of risk associated with team instability.
- B. In the daily log by the project manager following the retrospective.
- C. In the lessons log displayed on the team information radiator.
- D. In the highlight report produced along with a burn-down chart.
Answer: C
Explanation:
The lessons log is a place to capture insights and reflections from retrospectives, making it accessible for the team to review and learn from past experiences. Documenting this observation there emphasizes the importance of team stability for successful delivery and can inform future practices and decisions.
NEW QUESTION # 34
Project scenario - Get fit with football!
(Note: The companies and people within the scenario are fictional)
Introduction
A Local Government Authority (LGA) has decided to organize a six-a-side football tournament. The tournament will contribute towards achieving the targets set by a national initiative to improve the fitness of children under the age of 16. As part of the LGA's policy of self-funding, this has to be achieved at zero cost to the LGA (and therefore the local tax payer). The cost of the event will be covered through fees paid by teams registered to take part in the tournament, sponsorship and monies raised during the day. Any surplus would be used for the maintenance of local sports centres.
Teams can register under one of several age groups for both boys and girls. In addition, family members are asked to attend to provide support.
This sports event is designed to be a family day out. The football tournament will have an event village including a kidz'-zone, catering, car parking, mobile changing rooms and toilets. The tournament will take place on the LGA-owned football pitches near the centre of the town, although space is somewhat limited.
Scope
The initial scope of the project includes:
a marketing campaign to promote the event;
a celebrity to open the event;
a website to provide information about the event and handle applications; an event village to support the 'family day out';
the training of LGA staff as volunteers to run and support the event;
back-office processes to handle the applications;
fundraising to cover the cost of the event.
The project has been set up with four work streams to deliver this work:
1. Marketing
2. Website
3. Event Village
4. Staff Training
Project Background
The LGA have extensive experience in using PRINCE2 and will run the event as a single project. The project manager is fully conversant with PRINCE2 Agile. One office in the LGA building in the centre of town has been given to the project for the entire duration. The office is across the corridor from the Marketing Department and the project manager has already put a sign on the door that says 'Mission Control'.
Timeline
An initial timeline has been suggested and is shown in the following diagram. The timeline may evolve due to the agile ways of working. The timeline shows how work streams are broken down into work packages and/or timeboxes.
Marketing - Additional information
The marketing campaign has two key areas to promote:
1. The event itself including the football tournament, event village and fundraising activities.
2. The LGA's long term aim to improve the fitness of children under the age of 16.
The Marketing Team has received some initial Scrum training but is unsure how it can be applied to their marketing work.
The Marketing Team is keen that the project manager provides them with a clear brief for the campaign before they spend too much time on it.
They have experience of working with a variety of marketing channels, although they are not sure which channel(s) will work most effectively to promote this type of event, and in particular to promote the LGA's longer term health aims.
The Marketing Team is not clear on the priority to assign to the two aims for the event.
The Marketing Team will publish advertisements and/or promotional material every week, with more information in each issue to keep the message up to date.
Nine releases are scheduled at the end of each of the nine week-long timeboxes.
The nine timeboxes within the marketing work stream are scheduled to include:
advertisements:
a radio interview;
production of a hand-out/flyer;
banners and signs to put up around the town and at the event;
the provision of a website and social media content;
promotional posters to be displayed by local businesses.
Using the Project Scenario and Marketing Additional information, answer the following question:
The Marketing Team have noted in their daily stand-up that they cannot work out the versions and review status of the information and photos which will appear on the website pages.
Which core practice might be the MOST useful to immediately help with the 'managing product delivery' process?
- A. Refer to a cumulative flow diagram to identify the status of the remaining work.
- B. Carry out a safe-to-fail experiment to identify a better way of working.
- C. Identify the effect of delaying the delivery of a web page in a daily stand-up.
- D. Visualize the status of the work using a 'ticket' board with 'swim lanes'.
Answer: D
Explanation:
Using a 'ticket' board with 'swim lanes' allows the Marketing Team to visualize the different versions and review statuses of the information and photos for the website. This practice helps clarify the current state of work, promotes transparency, and facilitates better communication within the team, ultimately supporting effective management of product delivery.
NEW QUESTION # 35
Project scenario - Get fit with football!
(Note: The companies and people within the scenario are fictional)
Introduction
A Local Government Authority (LGA) has decided to organize a six-a-side football tournament. The tournament will contribute towards achieving the targets set by a national initiative to improve the fitness of children under the age of 16. As part of the LGA's policy of self-funding, this has to be achieved at zero cost to the LGA (and therefore the local tax payer). The cost of the event will be covered through fees paid by teams registered to take part in the tournament, sponsorship and monies raised during the day. Any surplus would be used for the maintenance of local sports centres.
Teams can register under one of several age groups for both boys and girls. In addition, family members are asked to attend to provide support.
This sports event is designed to be a family day out. The football tournament will have an event village including a kidz'-zone, catering, car parking, mobile changing rooms and toilets. The tournament will take place on the LGA-owned football pitches near the centre of the town, although space is somewhat limited.
Scope
The initial scope of the project includes:
a marketing campaign to promote the event;
a celebrity to open the event;
a website to provide information about the event and handle applications; an event village to support the 'family day out'; the training of LGA staff as volunteers to run and support the event; back-office processes to handle the applications; fundraising to cover the cost of the event.
The project has been set up with four work streams to deliver this work:
1. Marketing
2. Website
3. Event Village
4. Staff Training
Project Background
The LGA have extensive experience in using PRINCE2 and will run the event as a single project. The project manager is fully conversant with PRINCE2 Agile. One office in the LGA building in the centre of town has been given to the project for the entire duration. The office is across the corridor from the Marketing Department and the project manager has already put a sign on the door that says 'Mission Control'.
Timeline
An initial timeline has been suggested and is shown in the following diagram. The timeline may evolve due to the agile ways of working. The timeline shows how work streams are broken down into work packages and/or timeboxes.
Staff Training - Additional information
The event will be supervised primarily by LGA staff volunteers. They will need to be trained in various skills so that:
- A. It applies the target poorly because the CSME should have been added during Stage 2 to improve progress.
- B. the event is carried out safely and professionally;
- C. It applies the target well because the relevant skills should be available for each timebox.
- D. staff members are able to give advice on health and fitness.
This is covered by four work packages:
1. Training syllabus:
* High-level design of the manual.
* Content of each module.
2. Course content for safety and professionalism:
* Detailed design of two modules:
* Health and Safety including basic first aid.
* Customer relations to look after people attending the event.
* Piloting the modules with a group of volunteers.
3. Course content tor giving advice on health and fitness:
* Detailed design of two modules:
* Exercise fundamentals including how to warm up and cool down.
* Healthy eating including what types of food are good for you.
* Piloting the modules with a group of volunteers.
4. Training delivery:
* Production of the training manual;
* Delivery of the training to the rest of the volunteers.
The Staff Training Team is staffed by in-house training staff members that have been involved in several waterfall projects but have not had any exposure to agile.
Using the Project Scenario and Staff Training Additional information, answer the following question:
The LGA's social media expert has advised that a few social media channels already used by the LGA have much more traffic than many of the others that are available.
However, the customer subject matter expert has requested a presence on a wide range of social media channels to promote the health and fitness messages.
Which reason explains why the team manager should focus delivery on the most popular social media channels according to the five targets? - E. It applies the target poorly because the LGA will NOT have access to the health and safety expert during Stage 3.
- F. It applies the target well because the team manager should remove obstacles to delivery.
Answer: C
Explanation:
Concentrating on the most popular social media channels maximizes the potential reach and engagement for the health and fitness messages. By prioritizing these channels, the team can effectively promote discussions and interactions, aligning with the goal of generating awareness and interest in the initiative while utilizing resources efficiently.
NEW QUESTION # 36
......
TestkingPDF online digital PRINCE2 PRINCE2-Agile-Practitioner exam questions are the best way to prepare. Using our PRINCE2 PRINCE2-Agile-Practitioner exam dumps, you will not have to worry about whatever topics you need to master. To practice for a PRINCE2 PRINCE2-Agile-Practitioner Certification Exam in the software (free test), you should perform a self-assessment.
New PRINCE2-Agile-Practitioner Dumps Questions: https://www.testkingpdf.com/PRINCE2-Agile-Practitioner-testking-pdf-torrent.html
- How Can You Pass PRINCE2 PRINCE2-Agile-Practitioner Certification Exam With Flying Colors? ???? Open ⏩ www.testkingpdf.com ⏪ enter { PRINCE2-Agile-Practitioner } and obtain a free download ????PRINCE2-Agile-Practitioner Braindumps Downloads
- PRINCE2 PRINCE2-Agile-Practitioner Exam Questions - 1 year of Free Updates ???? Enter ⮆ www.pdfvce.com ⮄ and search for [ PRINCE2-Agile-Practitioner ] to download for free ????PRINCE2-Agile-Practitioner Test Centres
- Practice PRINCE2-Agile-Practitioner Exam Fee ???? Test PRINCE2-Agile-Practitioner Preparation ???? PRINCE2-Agile-Practitioner Exam Forum ???? Download ▛ PRINCE2-Agile-Practitioner ▟ for free by simply entering ▷ www.exams4collection.com ◁ website ????PRINCE2-Agile-Practitioner Test Centres
- PRINCE2-Agile-Practitioner exam training vce - PRINCE2-Agile-Practitioner dumps pdf - PRINCE2-Agile-Practitioner torrent practice ???? Open ➡ www.pdfvce.com ️⬅️ enter ( PRINCE2-Agile-Practitioner ) and obtain a free download ????PRINCE2-Agile-Practitioner Exam Forum
- How Can You Pass PRINCE2 PRINCE2-Agile-Practitioner Certification Exam With Flying Colors? ◀ Download “ PRINCE2-Agile-Practitioner ” for free by simply searching on ➠ www.examcollectionpass.com ???? ????PRINCE2-Agile-Practitioner Valid Exam Sims
- PRINCE2 PRINCE2-Agile-Practitioner Questions To Complete Your Preparation [2025] ???? Immediately open ➽ www.pdfvce.com ???? and search for 《 PRINCE2-Agile-Practitioner 》 to obtain a free download ????Reliable PRINCE2-Agile-Practitioner Test Simulator
- Test PRINCE2-Agile-Practitioner Preparation ???? PRINCE2-Agile-Practitioner Valid Exam Sims ???? Reliable PRINCE2-Agile-Practitioner Test Simulator ???? Search for ➥ PRINCE2-Agile-Practitioner ???? on ⇛ www.exam4pdf.com ⇚ immediately to obtain a free download ????PRINCE2-Agile-Practitioner Exam Training
- PRINCE2 PRINCE2-Agile-Practitioner Exam Questions - 1 year of Free Updates ???? Search for ⏩ PRINCE2-Agile-Practitioner ⏪ and easily obtain a free download on ⮆ www.pdfvce.com ⮄ ????Exam PRINCE2-Agile-Practitioner Answers
- How Can You Pass PRINCE2 PRINCE2-Agile-Practitioner Certification Exam With Flying Colors? ???? Download ⇛ PRINCE2-Agile-Practitioner ⇚ for free by simply searching on “ www.exams4collection.com ” ????Valid PRINCE2-Agile-Practitioner Test Pass4sure
- Free PRINCE2-Agile-Practitioner Vce Dumps ???? PRINCE2-Agile-Practitioner Exam Training ???? PRINCE2-Agile-Practitioner New Dumps Pdf ???? Search for ➥ PRINCE2-Agile-Practitioner ???? and download exam materials for free through ▶ www.pdfvce.com ◀ ????Free PRINCE2-Agile-Practitioner Brain Dumps
- PRINCE2 PRINCE2-Agile-Practitioner Questions To Complete Your Preparation [2025] ???? The page for free download of ➡ PRINCE2-Agile-Practitioner ️⬅️ on ▛ www.pass4leader.com ▟ will open immediately ????Vce PRINCE2-Agile-Practitioner File
- PRINCE2-Agile-Practitioner Exam Questions
- www.academy.pnuxelconsulting.com class.ascarya.or.id lms.brollyacademy.com scholar-sense.com course.alefacademy.nl sophiaexperts.com graphiskill.com coursehike.com chartsalpha.in learningworld.cloud